Showing posts with label installation. Show all posts
Showing posts with label installation. Show all posts

Sunday, March 16, 2014

Installation Instructions for a Fuel Pump in a 2002 Chevrolet Suburban

The Chevrolet Suburban has been in continuous production since 1935. The 2002 model was a sport utility vehicle that also had other marketing names such as the GMC Yukon and Cadillac Escalade. This vehicle had several choices of engines, all of which had fuel injection. The fuel pump in the 2002 Chevrolet Suburban installs into the fuel tank. You must theore remove the fuel tank from the vehicle to install the fuel pump.

Instructions

    1

    Disconnect the cable on the negative terminal of the battery to avoid starting the engine accidentally. Remove the filler cap for the fuel tank to relieve the pressure in the fuel tank. Wrap a shop towel around the fuel pressure fitting on the fuel rail and attach a fuel pressure gauge to the fitting. Connect the bleed hose to the pressure gauge and place the open end of the bleed hose into a container approved for gasoline. Open the fuel pressure gauge to relieve the pressure in the fuel system. Remove the fuel pressure gauge from the fitting.

    2

    Place one end of a hose into the filler tube of the fuel tank and place the other end into the gasoline container. Siphon as much fuel as possible from the fuel tank into the container.

    3

    Disconnect the filler pipe and fuel lines from the fuel tank. Support the fuel tank with jack stands and remove the bolts for the fuel tank straps with a socket wrench. Disconnect the fuel tank straps and lower the fuel tank slightly so you can disconnect the harness clip from the cross member and the electrical connections from the fuel tank. Lower the fuel tank completely and remove it from the vehicle.

    4

    Turn the retaining ring for the fuel sender assembly counterclockwise with a fuel tank sending wrench. Remove the retaining ring, and detach the fuel sender assembly from the fuel tank. Discard the gasket on the fuel tank. Pull the fuel strainer from the fuel sender assembly and discard the strainer.

    5

    Detach the electrical connector for the fuel pump. Release the retaining clip for the fuel sensors electrical connector and detach the fuel sensors electrical connector. Release the retaining clip for the fuel level sensor and remove the fuel level sensor.

    6

    Install the new fuel pump and gasket by reversing steps two through five. Tighten the bolts for the fuel tanks retaining straps to 30 ft. lbs. with a torque wrench. Tighten the bolts for the cross member to 37 ft. lbs. Fill the fuel tank and replace its filler cap. Connect the cable for the negative terminal on the battery with a socket wrench. Turn the ignition on for two seconds, then turn it off for 10 seconds to pressurize the fuel system. Turn the ignition back on and check for fuel leaks.

Continue reading..

Tuesday, December 10, 2013

Installation Directions for a Sifton Harley Oil Pump on Harley Davidson Motorcycles

Installation Directions for a Sifton Harley Oil Pump on Harley Davidson Motorcycles

Sifton oil pumps are available for all Harley models for all years after 1935. Flatheads, Knuckleheads, Panheads and Shovelheads manufactured before 1980 may require crankcase modification. Good shop practice for Sifton installation on Harley-Davidson motorcycles manufactured between 1948 and 1962 requires the installer to plug and re-drill the crankshaft feed hole. Installation on models manufactured in the 1970s requires the installer to drill a pressure valve relief hole. Installation of a Sifton oil pump on Panheads manufactured from 1965 to 1969 requires the installer to drill a primary chain oil supply hole.

Instructions

    1

    Fit the pump assembly to the crankcase and inspect to ensure clearance between the oil pump body and crankcase. Improve clearance by carefully grinding down the oil pump body with a grinding tool.

    2

    Disassemble, clean and inspect the oil pump. Use combination wrenches to disassemble the oil pump. Reassemble the pump dry without lubrication.

    3

    Rotate the pump gears to check for binds. Confirm that drive gear keys are properly installed.

    4

    Determine if gears that bind are supply or return gears. Remove and rotate gears that bind 180 degrees.

    5

    Apply 20W50 engine oil to the oil pump drive shaft and the drive shaft bushing in the crankcase. Install the oil pump in the crankcase using combination wrenches and a flat head screwdriver. Place the pump drive gear over the drive shaft as the shaft is passed through the bushing and into the crankcase gear compartment.

    6

    Install the drive shaft gear key and snap ring with snap ring pliers

    7

    Hand tighten the two 1/4-inch x 1 1/2-inch bolts in the upper holes in the oil pump body. Attach the pump cover by hand tightening the four 1/4-inch x 2 3/4-inch bolts.

    8

    Turn the oil pump gear to check for binding. Tighten the four 2 3/4-inch bolts in a cross pattern to 10 foot pounds of torque with a torque wrench. Check for binding after tightening each bolt.

    9

    Turn the drive shaft to confirm free operation of the pump. Tighten the two remaining bolts to 10 foot pounds of torque with a torque wrench.

    10

    Remove the oil pump check valve ball assembly by hand. Pour clean motor oil into the pump supply fitting while turning the oil pump drive gear.

    11

    Replace the check ball, spring and cap after oil fills the check valve cavity.

    12

    Install the pinion shaft drive gear, pinion gear and remaining parts in the gear case following the procedures stated in the shop manual for your year and model Harley.

    13

    Connect the oil lines by tightening hose clamps over the return and supply fittings with a flat head screwdriver.

Continue reading..

Wednesday, November 27, 2013

1993 Geo Metro Timing Belt Installation

The Suzuki Cultus is a supermini manufactured by Suzuki since 1983. It is marketed under a variety of names, including the Geo Metro in the United States. The 1993 model belongs to the second-generation of this vehicle, and the United States version features a three-cylinder 1.0-liter engine with a single overhead camshaft. This engine design uses a timing belt to keep the camshaft synchronized with the crankshaft. You will need to replace the timing belt in a 1993 Geo Metro at 60,000 mile intervals.

Instructions

    1

    Remove the cable from the negative battery terminal with a socket wrench to ensure the engine doesnt start. Raise the vehicle with a jack and support it on jack stands. Disconnect the bolts for the crankshaft pulley and remove the crankshaft pulley.

    2

    Disconnect the cover for the timing belt with a socket wrench. Turn the crankshaft clockwise to align the timing marks on the camshaft and crankshaft gears. Disconnect the plate, spring and spring damper for the timing belt tensioner. Remove the timing belt tensioner and the timing belt.

    3

    Place the bolt for the timing belt tensioner plate into the hole on the timing belt tensioner. Install the timing belt tensioner, and connect the spring and spring damper. Tighten the bolt on the timing belt tensioner by hand.

    4

    Turn the crankshaft clockwise if necessary to realign the timing marks on the crankshaft and camshaft gears. Install the new timing belt onto the crankshaft and camshaft gears so that the arrow on the timing belt points in the clockwise direction.

    5

    Turn the crankshaft clockwise by two complete turns to remove the slack on the timing belt. Ensure that you align the timing marks on the crankshaft and camshaft gears. Tighten the stud on the timing belt tensioner to 8 foot-pounds with a torque wrench. Tighten the bolt on the timing belt tensioner to 20 foot-pounds.

    6

    Replace the timing belt cover and tighten its bolts to 8 foot-pounds with a torque wrench. Place the key way of the crankshaft pulley into the key on the timing belt pulley and install the crankshaft pulley. Tighten the bolts on the crankshaft pulley to 8 foot-pounds. Lower the vehicle and connect the cable for the negative battery terminal with a socket wrench.

Continue reading..

Sunday, November 24, 2013

Installation Instructions for a 1998 Honda Passport Window Switch

The 1998 Honda Passport did not come standard with electric windows, but some models included an optional feature. Models equipped with electric windows have a window switch attached to the door armrest. In time, this switch may fail, as do many electronic parts. When that happens, replace the window switch to restore your ability to raise and lower the windows.

Instructions

    1

    Turn the bolt or nut on the Passports negative battery cable counterclockwise to loosen it. Pull the cable from the battery to disconnect it.

    2

    Open the door. The drivers side door contains the master window switch, but there are also window switches on the other doors. The procedure to replace the switches is the same.

    3

    Cover the tip of a flathead screwdriver with masking tape. Insert the tip under the front edge of the window switch. Pry up to pop the front section of the window switch out of the door armrest. Move around the switchs perimeter, gently prying up to free the switch.

    4

    Pull the switch away from the door armrest. Examine the rear. Youll find an electrical plug attached to the back. Push the plugs tab to unlock it, and then unplug it from the switch. Set the old switch to the side.

    5

    Grab the new window switch. Plug the electrical plug into its rear. Set it into the door armrest mount.

    6

    Push the edges of the switch down firmly to secure it to the door panel armrest. Place the negative battery cable back onto the battery post and tighten its nut or bolt.

Continue reading..

Friday, November 22, 2013

Installation Instructions for an Eagle Talon Water Pump

The Eagle Talon is a compact sport car also marketed as the Mitsubishi Eclipse and the Plymouth Laser. Chrysler and Mitsubishi manufactured the Talon in a joint venture from 1989 to 1999; the latest version included the 1995 through 1999 model years. A late model Eagle Talon has a four-cylinder 2.0-liter engine with the water pump on the front of the engine. The installation of the water pump in this vehicle also requires you to drain the radiator.

Instructions

    1

    Remove the cable on the negative battery terminal to prevent starting the engine during the procedure. Place the drain pan under the radiator drain, and remove the drain plug. Allow the coolant to drain into the container and store it for later use. Replace the drain plug.

    2

    Disconnect the pivot bolt for the alternator brace with a socket wrench and remove the alternator brace from the water pump. Remove the retaining bolts for the rear cover of the timing belt and detach the rear cover from the engine. Disconnect the timing belt.

    3

    Remove the mounting bolts for the water pump with a socket wrench. Detach the water pump from the engine. Discard the gaskets and O-rings for the water pump.

    4

    Coat a new O-ring with water; mount it onto the water inlet pipe. Place a new gasket on the new water pump; install it to the engine block. Torque the mounting bolts for the water pump to between 8.7 and 11 foot-pounds with a torque wrench.

    5

    Install the timing belt and the rear cover for the timing belt with a socket wrench. Connect the alternator brace and tighten the pivot bolt for the alternator brace to 17 foot-pounds.

    6

    Fill the radiator with coolant. Reconnect the cable to the negative battery terminal. Start the engine and check for coolant leaks.

Continue reading..

Friday, November 1, 2013

Acura Timing Belt Installation

The Acura is a mid-size luxury sports car, manufactured since 1996. The engine for many late-model Acuras is Hondas J32A engine, which is a six-cylinder, 3.2-liter engine with a single overhead camshaft. The timing belt on this engine keeps the camshaft and crankshaft synchronized, and generally requires replacement every 60,000 miles. The primary consideration in installing the timing belt in an Acura is keeping the crankshaft and camshaft properly aligned during the procedure.

Instructions

    1

    Disconnect the negative battery cable with a socket wrench and remove the cover of the ignition coil. Raise the vehicle with a jack and support it on jack stands. Disconnect both front tires with a lug wrench. Remove the splash shield below the vehicle and detach the accessory drive belts.

    2

    Place a wooden plank on top of a floor jack and position the floor jack under the oil pan of the vehicle. Raise the floor jack slightly to take the engines weight off the side mount. Disconnect the bolts that attach the side mount to the engine and chassis with a socket wrench. Remove the side mount from the front of the engine.

    3

    Disconnect the mounting bolt for the dipstick tube with a socket wrench. Remove the dipstick from its O-ring mount. Remove the covers on the timing belt to expose the timing belt on the camshaft pulleys.

    4

    Turn the crankshaft clockwise to align the timing marks. The white mark on the crankshaft pulley must align with the timing mark on the cover of the timing belt cover. The timing marks on the camshaft pulleys must align with the timing marks on the rear upper cover of the timing belt.

    5

    Hold the crankshaft pulley in place with Holder Attachment Tool 07MAB-PY3010A. Disconnect the bolt on the crankshaft pulley with a socket wrench and pull the crankshaft pulley from the engine.

    6

    Remove one of the battery clamp bolts with a socket wrench. Screw the bolt into the hole at the base of the right cylinder head by hand to hold the timing belt adjuster in place. Remove the engine mount bracket and loosen the bolt for the idler pulley by five turns. Remove the timing belt and spark plugs.

    7

    Remove the bolt from the right cylinder head by hand and screw it into its original hole on the battery clamp with a socket wrench. Remove the timing belt tensioner and attach Stopper tool 14540-P8A-A01 to hold the auto-tensioner in place.

    8

    Repeat Step 4 to realign the timing marks on the crankshaft and camshaft, if necessary. Install the timing belt tensioner, and remove Stopper tool 14540-P8A-A01 to release the tensioner.

    9

    Install the new timing belt onto the crankshaft sprocket, idler pulley, left camshaft sprocket, water pump pulley, right camshaft sprocket and adjusting pulley in that order. Tighten the mounting bolt on the idler pulley bolt to 33 foot-pounds with a torque wrench. Connect the bolts that attach the engine mount to the engine. Tighten the No. 6 bolt to 104 inch-pounds and tighten the No. 10 bolts to 33 foot-pounds with a torque wrench.

    10

    Attach the timing belt covers with a socket wrench. Connect the crankshaft pulley and tighten its bolt by hand. Torque the crankshaft pulley bolt to 181 foot-pounds with a torque wrench and Holder Attachment tool 07MAB-PY3010A.

    11

    Rotate the crankshaft at least five complete clockwise turns to position the timing belt on the sprockets, and align the timing marks align once again. Perform Steps 1 through 3 in reverse order to install the remaining components. Adjust the tension on the drive belts.

Continue reading..

Wednesday, October 23, 2013

Rotary Lift Installation Specs

Rotary Lift Installation Specs

Rotary is a brand of vehicle service lift produced by the Vehicle Service Group and distributed throughout the world. The lifts are available in several configurations, including small mid-rise lifts, two-post lifts and heavy duty four post truck lifts. Each lift has a set of requirements that must be met when it is installed. Because Rotary lifts often raise several tons into the air, these installation requirements are an important factor in keeping operators safe.

Concrete

    Rotary lifts must be installed on a quality concrete floor that is free of cracks and defects. The minimum anchor depth for Rotary lifts is 3 1/4 inches. The total overall concrete thickness must be at least 4 1/4 inches for two-post lifts, or 5 inches for heavy-duty four-post lifts. The concrete must be rated to withstand 3,000 pounds per square inch. Rotary lift concrete anchors must be torqued to 150 foot-pounds.

Bay

    Standard two-post Rotary lifts must be installed in a bay of at least 12 feet inch length and 24 feet in width. For heavy duty two-post lifts, this requirement increases to 12 feet by 26 feet. Low rise Rotary lifts must be installed in an 11-foot-by-24-foot bay, while four-post lifts require a 15-foot-by-23-foot bay size. The minimum ceiling height for a Rotary lift is 10 feet. Heavy duty four-post lifts require approximately 5 feet of additional ceiling clearance.

Electrical

    Rotary lifts can be installed using several different electrical sources. The required electrical breaker size changes depending on the input voltage. For single-phase 100 volt installations, lightweight Rotary lifts require a 15 amp breaker, while larger lifts need a 25 amp breaker. Single-phase 220 volt installations must have either a 20 amp or 40 amp breaker, depending on the capacity of the lift. This breaker requirement drops to 20 amps if three-phase wiring is used. Installations using 400 volts and three-phase wiring require only a 10 amp breaker.

Hydraulic

    Rotary lifts require Dextron III automatic transmission fluid, or a similar International Standard for Organization specification fluid for use in the hydraulic system. Standard two-post Rotary lift installations must have 19 quarts, or 17.98 liters, of fluid. The lightweight mid rise lift requires only 6.5 quarts, while the heavy duty Rotary lift must have 22 quarts.

Continue reading..